Electrics for new kitchen installation - Part 1 on 9 Dec
Auftragsdetails
Region
Birmensdorf
Ausgeschrieben am
02.11.2015
Auftragsbeschreibung
Elektrische Arbeit
Mengen- und Massangaben
Preparation before installing a new kitchen, the following is to be done on the on 9 Dec: 1. Extractor fan: provide power supply to extractor fan from an existing power socket approx 110cm away. Wall structure = concrete 2.Wall unit lights: provide power supply to LED lights by extending an existing power cable approx 90cm. Wall structure = concrete 3. Wall unit lights: provide power supply to LED lights from an existing power socket approx. 70cm away. Wall structure = plaster / gipsum 4. Change existing power socket into a power socket + switch to activate the light power supply installed as part 3 5. Protect a total of 12 power sockets / outlets for plastering 6. Change an old dimmer switch to a new dimmer switch which can control LED lights
Angaben zu den Materialien
Keine Angabe / Weiss nicht
Beschreibung der aktuellen Situation
Kitchen has been removed prior to plastering and installation of new kitchen
Besonderheit
Kein Lift